The clear examples of these changes in the industry are the acquisition of IGE-XAO by Schneider Electric or SIEMENS investments in the electrical CAD market. It took 4 years of development and 30 engineering experts, since the market has evolved, and it is now characterized by the presence of major players. The first sale of elecworks™ was made in 2009. The 2D part was autonomous and we started to interface natively with SOLIDWORKS, with whom we entered into a strategic partnership. It was, therefore, necessary to interface with the 3D model of the machine. The creation of the digital model of the machine was intended to establish an interactive work environment for all the involved actors of the design phase (mechanics, electricians, automation specialists). The third reason is possibly the most innovative one, at least for those times: the collaborative design. The schema is the synoptic and it has been conceived to carry out the 2D design. Secondly, TSI introduced to the market a new type of schema to help mechanics, automation specialists and electricians to be on the same page of the project. First of all, the company has been literally the first in the market to include the of the digital representation of the electrical components and the complete cabinet in the 3D mock-up. Elecworks™ has been conceived as an innovative tool for three main reasons.
0 Comments
Leave a Reply. |